Request a Quote

Teaser Infrared Image - The Answer

Don’t worry, Dan, this is definitely not a BP oil rig!

Infrared Image

Visible Light Image

Answer: The image is of the lower portion of a crane boom, showing two hydraulic driven pumps that control the primary lift cable and the heavy lift cable. It is a 150 ton crane that was designed for field assemble of wind towers.

Sidenote: This particular type of crane has to be assembled and disassembled at the job site and is transported using about 25 semi trailers!

Stay tuned for part 2 next week!

Leave a Reply

 

 

 

You can use these HTML tags

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>